Golden Arrow
General Contractor
|
Goal: Renovate a circa 1920’s 10 unit UA area apartment facility with all new HVAC systems.
|
|
Camino Cantil Custom home Pima county Az |
Goal: Install custom duct system in new home using spiral pipe and linear slot diffusers.
|
|
Goal: Install custom duct system and evaporative cooling in 1930's home using hard duct
|
|
Historic Wilcox area ranch house Dos Cabezas Az |
Goal: Install custom duct system and evaporative cooling in 1920's ranch house using hard duct and spiral pipe.
|
|
residence Tucson Az |
Goal: Install custom duct system and re-use existing heat pumps while adding approximately 600 sq ft to home.
|
|
Bus station Tucson Az |
Goal: Relocate Greyhound bus station to temporary location to facilitate the remodeling of the old train station and down town intersections on 4th avenue.
|




|
|
Goal: Transform an historic existing
adobe building (circa 1815) into one with air
conditioning. Considered to be Wyatt Earp’s
residence in
|




|
Mountain View High School, Culinary arts building Marana Az |
Goal: Incorporate 6 commercial grade grease hoods and 10 heat pump systems and make up air systems into 9000 sq ft modular building housing classrooms for Tucsons future chef's.
|